Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Volume
- References
- Conference Volume
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Volume
- References
- Conference Volume
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Volume
- References
- Conference Volume
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Volume
- References
- Conference Volume
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Volume
- References
- Conference Volume
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Volume
- References
- Conference Volume
- Paper No
NARROW
Format
Article Type
Conference Series
Subject Area
Topics
Date
Availability
1-1 of 1
Salvatore Poddighe
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Proc. ASME. PVP2017, Volume 7: Operations, Applications and Components, V007T07A011, July 16–20, 2017
Paper No: PVP2017-65446
Abstract
Some examples how an experienced fabricator can manage in-field alteration of critical equipment in order to satisfy new customer needs are presented and relevant implications evidenced. 1) Site modification of a Cr-Mo-V Reactor A high thickness, large diameter 2.25Cr-1Mo-0.25V Hydrocracker Reactor was completed in field by performing three circumferential seams and related LPWHT. Since the Customer decided to modify the process and to add a new catalyst bed, design changes were implemented to add a new catalyst bed and a new 8” quench nozzle. 2) Rehabilitation of existing Reactor An existing reactor no more in operation for several years was rehabilitated in field to comply with a new process unit layout (debottlenecking) to comply with current law requirements. 3) Site Assistance during schedule Turnaround activities Reactors are designed for extended life cycle up 25 to 30 years, but severe operating conditions may require reconditioning after onsite inspection during scheduled turnaround. Fabricator has been involved jointly with End User and Process Licensor for design changes and has responsible for the onsite execution activities.